Guide · 2026-11-04
Copper retirement in the Coastal Bend
Two carriers are retiring copper here, on two different schedules.
Verizon: on or after Nov 6, 2026
Verizon's notice covers all remaining copper in eight Coastal Bend wire centers, on or after Nov 6, 2026.
| Town | Wire center |
|---|---|
| Portland | PTLDTXXA |
| Ingleside | INSDTXXA |
| Aransas Pass | ARPSTXXA |
| Robstown | RBTNTXXA |
| Taft | TAFTTXXA |
| Odem | ODEMTXXA |
| Bishop | BSHPTXXA |
| Agua Dulce | AGDLTXXA |
- Retirement applies to all remaining locations in each wire center.
- Verizon may move customers off copper before that date.
- After retirement, Verizon no longer maintains the copper.
Source: Verizon notice 2026-03-A-TX, Aug 7, 2026.
AT&T: area by area
AT&T retires copper one distribution area at a time inside each wire center, under FCC notices.
- Corpus Christi: parts of all seven wire centers (Wyman, Calallen, Flour Bluff, Padre Island, Corpus Christi Terminal, Tulip, CRCHTXBU), notice ATT20240025C, since April 2024.
- Alice, Kingsville, Rockport, Mathis: parts of each, notices ATT20240023C, ATT20240031C, ATT20240033C and ATT20240176C.
- More Texas wire centers were added in 2026 (FCC WC 26-162 and WC 26-192). AT&T plans to retire copper across its footprint by the end of 2029.
- Notices list distribution areas, not street addresses, and the notice period is now about 90 days.
The replacement
A solar box and an equipment box at the road, with every device on site left as it is. V1 Standard for most sites; V2 Class I Div 2 for classified areas; V3 Fire-ready where there is a fire alarm panel.
Next step
Price your setup on Build yours, then talk it through with us.
Build yoursBook a callCall now 817-793-3779
Related: Service areas · Copper line inventory checklist